Deliverables

4 packages ยท 19/41 items complete

CDConference Room Construction Documents
73%
DDAV Design Development Package
100%
CommissioningCommissioning Package
0%
CloseoutAs-Built Package
0%

Conference Room Construction Documents

CDIn Progress
12 drawings6 documentsToday, 9:14 AMRev C
11/15 items complete2 warnings2 missing73%
Cover Sheet
Drawing Index
General Notes & Legend
Floor Plan โ€” AV Rough-In
Reflected Ceiling Plan

Needs update after ceiling change

Signal Flow Diagram
Rack Elevation โ€” RK-01
Panel Elevations

Not generated

Equipment Schedule
Cable Schedule
Network Schedule
Power Requirements Summary

Exceeds PDU โ€” pending resolution

Commissioning Checklist

Not generated

Manufacturer Cut Sheets
Submittal Package

AV Design Development Package

DDIssued
8 drawings4 documentsJul 22, 2026Rev B
8/8 items complete100%

Commissioning Package

CommissioningPending
3 drawings8 documentsNot generated
0/8 items complete8 missing0%

As-Built Package

CloseoutPending
14 drawings10 documentsNot generated
0/10 items complete10 missing0%